RFQ UKZN 13/2025

Refurbishment to offices of the College of teaching and learning (Howard Campus)

RFQ UKZN 12/2025

Refurbishment to offices of the College of teaching and learning (Edgewood Campus)

RFQ UKZN 29/2025

Renovation of Student Discipline-Installing new carpets, new office, repainting, new windows, new cabinets

RFB UKZN 05/23

THE GENERAL MAINTENANCE & RENOVATION AT TOWER BUILDING/ALBERT LUTHULI RESIDENCE, HOWARD COLLEGE CAMPUS

RFB UKZN 30-24

LECTURE AND CRITICAL VENUE POWER BACKUP PROJECT: VARIOUS BUILDINGS LOCATED WITHIN THE UNIVERSITY OF KWAZULU-NATAL (UKZN), WESTVILLE CAMPUS

RFQ UKZN 92-24

Addendum 1: Supply, Alterations for new laboratory and post grad study area – NEW LABORATORY – ROOMS 017/018/019 NEW POST GRAD STUDY AREA – ROOMS 020 A/B/C

RFB UKZN 21-24

ADDENDUM 02 – NEW LIVELIHOOD BUILDING, PHASE 2 AT UNIVERSITY OF KWAZULU-NATAL, PIETERMARITZBURG CAMPUS

RFB UKZN 21-24

NEW LIVELIHOOD BUILDING PHASE 2 LOCATED AT THE UNIVERSITY OF KWAZULU-NATAL (UKZN), PIETERMARITZBURG CAMPUS

RFQ UKZN 93-23

Installation of a wheelchair lift at Dulcie September building at UKZN EDGEWOOD CAMPUS